WBS (Work Breakdown Structure) Cost Report

WBS (Work Breakdown Structure) Cost Report

The WBS Cost Report can allow users to drill down to any WBS level in a few clicks.
Simply click on the graph column or the WBS name to drill down to the level below.
This will show the value for each level



Learn more about WBS Structures


    • Related Articles

    • WBS (Work Breakdown Structure) Cost Structure

      The WBS is used for cost control across the job Each job can have its own WBS structure or draw from saved  WBS costs structures
    • Action: Create a WBS Cost Structure

      The Work Breakdown Structure (WBS) Cost Structure is used to calculate and report Job values.  Your WBS Cost Structure is made up of nodes - parent and child nodes. Costs will settle against child nodes or the parent node (if no subsequent child ...
    • Report: Actual Cost

      We all know that having access to  accurate real time information gives us the confidence to make the right decisions!  That is why QicWorks has made it super easy to see exactly what each Job is Costing you from the one report - Actual Cost Report. ...
    • APP: Work

      Designed from the bottom up, with the end user in mind, our Site Reports include the latest tech such as voice to text, GPS location, image annotations, slider bars and digital signatures to capture client authorisation. It also contains time saving ...
    • WBS Management

      The Work Breakdown Structure (WBS) is used throughout QicWorks to provide a whole of job perspective on the activities and tasks required to be undertaken to deliver the jobs deliverables and the settlement of Jobs costs based on specific activities. ...